4/5 - (1 vote)

Pass Guaranteed Quiz 2022 Realistic Verified Free C_TS422_2020 Exam Dumps

Free SAP Certified Application Associate C_TS422_2020 Ultimate Study Guide (Updated 150 Questions)

SAP C_TS422_2020 Certification Exam Topics:

Topic Areas Topic Details, Courses, Books
Demand Management in SAP S/4HANA < 8%

Explain and compare the different production methods in make-to-order, make-to-stock, and assembly planning.

Introduction to SAP S/4HANA Production Planning < 8%

Outline production planning components and functions, differentiate consumption-based planning vs. MRP, outline new trends in production planning.

Lean Manufacturing in SAP S/4HANA 8% – 12%

Identify repetitive manufacturing specific master data, explain line load planning and confirmation, outline Kanban master data and Kanban processes.

Capacity Planning in SAP S/4HANA 8% – 12%

Outline best practices for using SAP S/4HANA, describe the SAP HANA database concept and new user experience with SAP Fiori, outline the capabilities of embedded analytics.

Master Data in SAP S/4HANA > 12%

Identify and explain production relevant master data, including, but not limited to: bill of material, routing and production version.

Advanced Planning in SAP S/4HANA > 12%

Outline the basics and master data of advanced planning,  explain tools (alert monitor, detailed scheduling planning board) and advanced planning and detailed scheduling processes, explain planning evaluation concepts

Material Requirements Planning in SAP S/4HANA 8% – 12%

Select and apply planning strategies, use the planning table, characterize long-term planning and master production scheduling, outline MRP basics and steps of MRP, and describe lot size procedures.

 

NEW QUESTION 81
What are examples of assignment objects you can maintain in the Engineering Workbench?
There are 3 correct answers to this question.

 
 
 
 
 

NEW QUESTION 82
Which actions does the system perform by default when you save aconfirmation for a finished product in repetitive manufacturing? Note: There are 3 correct answers to this question.

 
 
 
 
 

NEW QUESTION 83
The settings for MRP can be maintained at different levels. If settings have been maintained in different places, in which sequence does the system search for the MRP settings? Please choose the correct answer.

 
 
 
 

NEW QUESTION 84
What are the possible categories for the Business Partner master data object in SAP S/4HANA?
There are 3 correct answers to this question.

 
 
 
 
 

NEW QUESTION 85
What is the purpose of collective orders?

 
 
 
 

NEW QUESTION 86
What data processing steps are obsolete if you use SAP S/4HANA Analytics? There are 2 correct answers to this question

 
 
 
 

NEW QUESTION 87
Which time elements are relevant for lead t me scheduling of a product on order? Note: There are 2 correct answers to this question.

 
 
 
 

NEW QUESTION 88
What is the equivalent in SAP S/4HANA of the Production Data Structure in PP/DS?
There are 3 correct answers to this question.

 
 
 
 

NEW QUESTION 89
In Make-to-order production, which field controls whether the components will be planned as sales order specific stock?

 
 
 
 

NEW QUESTION 90
Which material master setting is required to use the repetitive planning table for production with production orders?

 
 
 
 

NEW QUESTION 91
You want to schedule an order in the graphical planning board. What are valid planning directions?
There are 2 correct answers to this question.

 
 
 
 

NEW QUESTION 92
A planner updated a production order status from partially confirmed “PCNF”to technically completed “TECO” by mistake.
What impact would this have to other users for this specific production order?

 
 
 
 

NEW QUESTION 93
What capabilities does SAP S/4HANA embedded analytics provide? There are 2 correct answers to this question.

 
 
 
 

NEW QUESTION 94
In the first step, you have created master recipes. In which sequence are the additional objects created?

 
 
 
 

NEW QUESTION 95
You want to reduce planning efforts for B/C materials. Which planning procedure do you recommend?

 
 
 
 

NEW QUESTION 96
You have a scheduling agreement with a vendor. You want classic MRP to automatically create schedule lines in case of material shortage. What must you do? Note: There are 2 correct answers tothis question.

 
 
 
 

NEW QUESTION 97
Where do you maintain the duration of a producton operation?

 
 
 
 

NEW QUESTION 98
When working with both cross-plant and plant-specific material statuses in the mater al master, which status has the highest priority?

 
 
 
 

NEW QUESTION 99
You need to model goods receipt processing time in Detailed Scheduling. Which modelling options do you have? Note: There are 2 correct answers to this question.

 
 
 
 

NEW QUESTION 100
For a production version to be valid and consistent what requirements must be fulfilled? Note: There are 3 correct answers to this question.

 
 
 
 
 

Get to the Top with C_TS422_2020 Practice Exam Questions: https://www.examdumpsvce.com/C_TS422_2020-valid-exam-dumps.html

         

Related Links: myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below