NEW QUESTION 57
What are the consequences when you assign a planned order to a production line manually, using the planning table in repetitive manufacturing?

 
 
 
 

NEW QUESTION 58
What does the bill of material usage (BOM usage) control at the BOM item level? There are 2 correct answers to this question.

 
 
 
 

NEW QUESTION 59
Your production planners must execute planning only for specific resources. How can you achieve this in Advanced Planning (PP”/OS)?

 
 
 
 

NEW QUESTION 60
What is a work center hierarchy in SAP S/4HANA capacity planning?

 
 
 
 

NEW QUESTION 61
You are using the document management system (DMS) . Where should the DMS document links be assigned, to have them automatically copied to production orders?
There are 2 correct answers to this question.

 
 
 
 

NEW QUESTION 62
Which time elements are relevant for lead t me scheduling of a product on order? Note: There are 2 correct answers to this question.

 
 
 
 

NEW QUESTION 63
Which material master data can you copy when you use the Copy Material program (transaction MMCC, Material Master Copier) to create new materials? There are 2 correct answers to this question.

 
 
 
 

NEW QUESTION 64
For a production version to be valid and consistent what requirements must be fulfilled? Note: There are 3 correct answers to this question.

 
 
 
 
 

NEW QUESTION 65
The pegging situation was changed because of an MRP heuristic run. What is a capability of dynamic pegging?

 
 
 
 

NEW QUESTION 66
An issue storage location was NOT found through the work center, bill of material (BOM)item, or material master. Whatdetermines whether the storage location can be derived from the production version?

 
 
 
 

NEW QUESTION 67
What must be used in the system to plan the requirements for different subcontractors separately?

 
 
 
 

NEW QUESTION 68
You want to schedule an operation finitely, without moving other operations. Which scheduling strategy do you select?

 
 
 
 

NEW QUESTION 69
You want to triggering-houseproduction of a semi-finished mater al before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements for the semi-finished material?

 
 
 
 

NEW QUESTION 70
Why would you use phantom assemblies? Note: There are 3 correct answers to this question.

 
 
 
 
 

NEW QUESTION 71
What are prerequisites for using batch derivation? There are 2 correct answers to this question.

 
 
 
 

NEW QUESTION 72
You want to perform capacity availability checks on your production orders. What must be set for this to occur? Note: Thereare 2 correct answers to this question.

 
 
 
 

NEW QUESTION 73
In Demand-Driven Replenishment, materials are classified according to several criteri a. What criteria can you use?
There are 3 correct answers to this question

 
 
 
 
 

NEW QUESTION 74
Which master data object governs the relationship between supply source and demand source in the Kanban process?

 
 
 
 

NEW QUESTION 75
A planner updated a production order status from partially confirmed “PCNF”to technically completed “TECO” by mistake.
What impact would this have to other users for this specific production order?

 
 
 
 

NEW QUESTION 76
Which alternative item strategies are available in bills of materials (BOM) in SAP S/4HANA?
There are 2 correct answers to this question.

 
 
 
 

Passing Key To Getting C-TS422-2020 Certified Exam Engine PDF: https://www.examdumpsvce.com/C-TS422-2020-valid-exam-dumps.html

         

Related Links: myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below